RapidRFPRapidRFP
Built for Construction & AEC

Score the selection committee’s rubric before you submit it.

Best-value, CMAR and design-build awards are decided by a committee scoring against published, weighted criteria; QBS ranks firms purely on qualifications (SF 330). RapidRFP assembles your SOQ and scores your proposal the way that committee will, before you submit.

Grounded · cited · scored before you submit · never trains on your data

rapidrfp · configured for Construction & AEC
ready
Best-value
Scored the way the selection committee will
QBS
SF 330 qualifications ranked against the criteria
Reuse
Project sheets, resumes, safety & EMR data
Checks pass
Nothing ships until it passes review

Tuned for your arena

Best-value & CMAR scoringQBS / SF 330 qualificationsStatement of Qualifications (SOQ)Safety & EMRBonding & suretyNothing ships until it passes
construction & aec mode · live

The 4-step Construction & AEC pursuit, run inside RapidRFP.

New to RapidRFP?

RapidRFP is one system for construction and AEC pursuits: it qualifies the solicitation, tracks every submittal requirement, drafts from your project record, and grades the package against the selection committee’s criteria before it goes out.

01QUALIFY

Bid or walk, in minutes

The pursuit graded against your project history, bonding capacity and crew availability.

02MAP

Every submittal, tracked

RFP and SF 330 requirements parsed into a checklist with owners and due dates.

03DRAFT

Written from your record

Project descriptions, key personnel and safety record pulled from your library and cited.

04SCORE

Graded before submission

The package rated against the committee’s published criteria, with a fix list.

How RapidRFP wins it

AI in the loop for construction & aec work

Qualifications

Statements of qualifications that make the short list

Assemble authoritative SOQs and design-build narratives — pulling your strongest project sheets, key-personnel resumes and differentiators into an on-brand, owner-tailored package.

  • SOQ & qualifications-package assembly
  • Design-build, CMAR & IPD narratives
  • Key-personnel resumes & org charts
  • Owner-specific tailoring
qualifications.enginerunning

Qualifications

4 of 4 checks passed

Complete
SOQ & qualifications-package assemblydone
Design-build, CMAR & IPD narrativesdone
Key-personnel resumes & org chartsdone
Owner-specific tailoringdone
Compliance

Extract requirements from massive spec sets

The shredding engine reads hundreds of pages of specifications and instructions to bidders, pulls out the compliance requirements, and builds a checklist your estimators can actually work from.

  • Requirement extraction from spec sets
  • Instructions-to-bidders (ITB) parsing
  • Compliance checklist & matrix
  • RFQ → SOQ → RFP two-stage support
compliance.enginerunning

Compliance

4 of 4 checks passed

Complete
Requirement extraction from spec setsdone
Instructions-to-bidders (ITB) parsingdone
Compliance checklist & matrixdone
RFQ → SOQ → RFP two-stage supportdone
Evaluator simulation

Score the way the selection committee will

An owner + A/E + cost-consultant committee scores against published weighted criteria. QBS work ranks firms on qualifications alone, price omitted, on SF 330. RapidRFP predicts your score or rank, with the fixes.

  • Best-value weighted-criteria scoring
  • QBS / SF 330 ranking, price omitted
  • Method-aware: best-value vs. QBS
  • Predicted score, then re-score
evaluator-simulation.enginerunning

Evaluator simulation

4 of 4 checks passed

Complete
Best-value weighted-criteria scoringdone
QBS / SF 330 ranking, price omitteddone
Method-aware: best-value vs. QBSdone
Predicted score, then re-scoredone
Before you submit

Graded against the rubric you’ll actually be scored on.

Evaluation rubric

QBS / SF 330 committee scoring

1 to fix

Relevant project experience

Strong

Key personnel & team

Strong

Approach & schedule

Adequate

Local presence & capacity

Adequate

RapidRFP applies the selection committee’s published criteria to your package and returns the score per criterion, what a reviewer would mark down, and the fixes that move the score most.

See how proposal scoring works
Construction & AEC, today vs with RapidRFP

How the work actually changes.

Submittals
How it’s done todayA checklist in someone’s head and a shared drive
RapidRFPEvery submittal requirement extracted, assigned and tracked
Drafting
How it’s done todayProject sheets rewritten for the tenth time
RapidRFPAssembled from your real project record and cited
Review
How it’s done todayA partner reads it the night before it’s due
RapidRFPMissing criteria and unsupported claims flagged days earlier
Confidence
How it’s done todayYou find out at the shortlist
RapidRFPYou see the committee score while you can still act on it

Built for the language of construction and AEC pursuits

RapidRFP speaks your industry’s vocabulary out of the box — no prompt engineering required.

  • Best-value selection-committee scoring
  • QBS / SF 330 qualifications ranking
  • Statement of Qualifications (SOQ) assembly
  • Design-build, CMAR & IPD narratives
  • Spec set & requirement extraction
  • Past-project (project sheet) library
  • Key-personnel resumes & org charts
  • Safety records & EMR references
  • Bonding capacity & surety
  • On-brand graphics & layouts
We pursued two more design-build short-lists last quarter with the same proposal team. RapidRFP did the assembly and our people focused on the win strategy.
Proposal Manager · ENR-ranked general contractor (composite)
Questions

Frequently asked questions

Common questions from construction & aec teams.

Yes. It assembles SOQs and design-build narratives from your project sheets, key-personnel resumes and differentiators, tailored to the owner and styled on-brand — the core of how AEC firms win the short list.

Ready to win more construction & aec work?

Book a 30-minute demo and watch RapidRFP shred and draft a real solicitation from your space.

Self-checking loops · grounded & cited · never trains on your data